Barn Work

All during the Christmas break, John and I have been working on getting the big barn finished. As of this writing, we have the back wall completed, with a solid wall and two large rolling doors. This will allow us to drive the motor home in, which is the major reason for this barn.

The first part of the job was constructing the beams, with 2 x 6 x 12 braces, and a double set of roller tracks. Once this was constructed, it needed to be lifted into place and bolted in. Huge undertaking. John ended up borrowing a block and tackle from a farmer friend, totally the right tool for the job.
In this picture it kind of looks like Farmer John was confused, was he trying to grow panels? Wrong crop! The point here was that we set up all these panels and the 2 x 4's below and prepainted them with their first coat of barn red paint. We will go back and roll them again, but we wanted to get a first coat on before they were up.

Next we constructed the doors out of 2 x 4's and panels. The first 2 doors are up, and the solid wall. In the daylight I will go out and get some more pictures.